Meet the friendly firefighters of Fort Worth Fire Department Station #5 – Emphasis on the word friendly.
and their apparatuses:
- The newly dedicated Engine 5 “Top Gun”
- And sidekick EMS 99
Walk through of the new Station 5 Bay: As you can see I started in the back of the building and made my way towards the front. Parked in front of the building is the newly dedicated Engine 5 also known as “Top Gun”
Station 5 covers from Hwy 121 on the North to Berry Street on the South and from University Street on the West to Interstate 820 on the East An approximation of the service area is shown here: http://g.co/maps/w4xku. They cover roughly 1/4 of the city and due to it’s location + ease of highway also covers all highway call in the area.
There are 15 Firefighters working at Station 5, 5 per shift. Four ride on the engine (including either a Captain or Lieutenant) and one is assigned to the EMS truck.
Working "A" Shift is:
Lt. Alrcantan
FF R. Jones
FF Becerra
FF Vega
with FF/EMT Khouns on the EMS truck
Working "B" Shift is:
Capt. Brunson
FF Fowler
FF M. Jones
FF Babich
with FF/EMT Warren on the EMS truck
Working "C" shift is:
Lt. Knox
FF Clark
FF Cessum
FF Cadman
with FF/EMT Brown on the EMS truck
A Little History:
The first Station 5 was built in 1890 (near 400 block of Bryan Avenue) and was also a Community Hall. There, began a long history of its association with the community
The second Station 5 was built in 1911 (near the same location), was no longer a community hall but was still an integral part of the neighborhood it served
The third Station 5 was built in 1965 (at 1000 Evans Street), where it would be housed till 2012, and continued the tradition of community involvement helping neighborhood kids with their bikes (incuding repairs) and even giving them to kids who didn’t have one.
Now Fire Station 5 has a new home on the corner of Irma St & Evans St. At 850 Irma Street; Fort Worth, TX 76104 (as of posting google maps does not show the new Fire Station)
* Thank you to PIO Tim Hardeman of Fort Worth Fire Department for providing me with a brief history of FWFD Station 5*
Construction for the new station has been in the works for two years and the actual construction has taken about one year, costing in the neighborhood of 3.5 – 4.5 million dollars. Friday April 27, 2012 marked 3 weeks “in the house” and the official grand opening / open house took place Saturday April 28, 2012 FWFD station 5 Grand Opening/ Open House
At 5 or 10K SF (information sources vary & I am awaiting confirmation) the station is 3 times the size of most other stations and is said to be the largest (or at least one of the largest) stations in the city and is completely ADA compliant. The price tag was said to be in the neighborhood of 3.5 to 4.5 million dollars.
Posted by Tena Carr in
FIRE DEPARTMENTS,
FORT WORTH FIRE,
FORT WORTH NEWS,
News and tagged
Fire,
Fire Department,
FIRE DEPARTMENTS,
Fire Station,
firefighters,
grand opening,
open house,
station5 |
You must be logged in to post a comment.